A JOURNEY THROUGH SOLAR ENERGY
ENERGY
BEGINS HERE.
A cinematic scientific illustration.
Distances and time are compressed.
Illustrative layers and motion, enlarged.
Continuing light and a connected circuit.
THE CONNECTION APPLICATION SERVICE / GREAT BRITAIN
Your G99 application,
handled.
G99 FORM A1-2
£250 fee + £50 VAT
Preparation, submission and follow-up.
For one suitable Form A1-2 application. The campus is illustrative; the fee is not an installation price or a guarantee of approval.
The right details.
A considered submission.
You provide the installation details. Aesir prepares and submits the G99 Form A1-2 application to the appropriate network operator across Great Britain, then follows it through the process.
The fee covers the application service; it does not buy a solar installation or guarantee network approval. It does not cover commissioning, a grid upgrade or a guaranteed timescale.
Already have an installer?
Installers keep their job and accreditation. We support the application.
Own the property?
You can discuss installation separately with us. It is not included in this fee.
THREE SIMPLE STEPS
From details
to submission.
- 01
Tell us about the installation.
Complete the existing form with your contact, site and equipment details.
- 02
We prepare and submit.
Aesir prepares the Form A1-2 application for the relevant network operator.
- 03
We follow it through.
We handle follow-up. The operator decides the outcome and any further requirements.
BEFORE YOU PAY
The right application
for your installation.
Already have an installer? We support their application. Unsure whether Form A1-2 fits your equipment? Check the guidance or talk to us first.
BEFORE YOU APPLY
The essentials.
What does the £300 cover?
£250 fee + £50 VAT = £300 total for one suitable G99 Form A1-2 application across Great Britain: preparation, submission and follow-up. Installation, commissioning, network works and approval are separate. Read the refund policy.
What will I need?
Your contact and site details, inverter model, registered AC output and supply information. Include available type-test, storage, export-limitation and backup details. The application form guides you through them.
Can I keep my own installer?
Yes. Installers keep their job and accreditation. Property owners can discuss installation separately with Aesir; it is not included in the application fee.
Is approval or timing guaranteed?
No. The network operator’s assessment and any further requirements determine the outcome and timing. The application-service fee does not grant permission to operate. Talk to us about your installation.
One recorded example.
Premier Composites, Lincolnshire, England. 206.41 kWh recorded on .
Supplied Tigo Energy Intelligence (EI) transcription; not independently verified or live. Separate from the illustrated campus.
Read the dated record and approximate hourly chartREADY WHEN YOU ARE
Your application.
Let’s get it started.
£250 fee + £50 VAT = £300 total.
